5. Progress & Final Invoicing, Receipting & Project Closeout ​

This guide covers the completion stages at Edge Home Solutions: issuing the 40% Delivery Milestone Invoice & Receipt, managing site finishing and snag clearance, issuing the 10% Final Retention Invoice & Receipt, and performing real-time project profitability and gross margin analysis.


1. Natural System Flow Position ​

mermaid
flowchart LR
    A["1. Lead Intake & 3D Survey"] --> B["2. Quotation & Contract"]
    B --> C["3. 50% Deposit Invoicing & Receipt"]
    C --> D["4. Project Execution & Workshop"]
    D --> E["πŸ“Œ 5. Progress/Final Invoicing & Closeout"]
    style E fill:#2563eb,stroke:#1d4ed8,color:#ffffff

πŸ–₯️ Live ERP Desk Screens for Step 5


2. Milestone 2: 40% Delivery Invoicing & Payment Entry ​

When workshop pre-assembly is completed and modular cabinetry is staged at the client site:

Generating the 40% Delivery Sales Invoice: ​

  1. Open the Sales Order (or go to Sales Invoice List).
  2. Click Create β†’ Sales Invoice.
  3. Under Payment Schedule, select Milestone 2: EHS 40% Workshop Completion / Delivery (calculates to 40% of contract sum).
  4. Verify VAT / eTIMS compliance.
  5. Click Save and Submit.

Recording the 40% Payment Entry: ​

  1. From the Sales Invoice, click Create β†’ Payment.
  2. Verify:
    • Payment Type: Receive.
    • Account Paid To: Selected Bank / M-Pesa account.
    • Paid Amount (KES): 40% progress amount.
    • Cheque / Reference No: Bank transaction reference.
  3. Click Save and Submit.

3. Site Installation, Snagging & Handover Acceptance (Task 9 - 12) ​

With the progress payment confirmed, site fitters complete final installation:

Key Finishing Milestones: ​

  • Task 9: Shutter doors hung, 3-way concealed hinges adjusted for uniform 2mm reveal gaps, soft-close dampers calibrated.
  • Task 10: Calacatta quartz or granite countertop template verified, undermount sink epoxy bonded, hob cutout chamfered, and waterproof silicone sealed.
  • Task 11: LED ambient warm lighting wired, surface protective foils peeled, cabinet interiors vacuumed, and panels polished.

Joint Snag Walkthrough & Sign-off (Task 12): ​

  1. Lead Project Engineer and Client perform joint inspection.
  2. Complete Snag Clearance Checklist:
    • [ ] Smooth soft-close drawer damping without bounce.
    • [ ] Shutter door alignments perfectly plumb and flush.
    • [ ] Countertop joints sealed and polished seamlessly.
    • [ ] Kickplates and filler trims scribed neatly to floor and wall.
  3. Client signs the Handover Acceptance Certificate.
  4. Mark Task 12 and Project status as Completed.

4. Milestone 3: 10% Final Retention Invoicing & Final Receipt ​

Upon client handover sign-off:

1. Issue Final 10% Retention Invoice: ​

  1. Open the Sales Order β†’ Create β†’ Sales Invoice.
  2. Select Milestone 3: EHS 10% Final Retention Handover.
  3. Verify remaining 10% balance.
  4. Click Save and Submit.

2. Record Final Payment Entry: ​

  1. Click Create β†’ Payment.
  2. Enter Bank / M-Pesa reference and submit.
  3. Result: Sales Order, all 3 Milestone Invoices, and all 3 Payment Entries show status Paid / Closed.

5. Post-Project Costing & Profitability Analysis ​

ERPNext automatically aggregates all project revenue against actual costs to provide real-time gross profit metrics:

Financial Analysis Tools: ​

  1. Project Profitability Report:
    • Navigate to Projects β†’ Reports β†’ Project Profitability (View Report).
    • Total Billed Revenue: Sum of Milestone Invoices (50% + 40% + 10%).
    • Direct Material Cost: Stock Entries issued to Workshop WIP (MDF, Plywood, Quartz, Hardware).
    • Direct Labor Cost: Timesheet hours logged by workshop carpenters and CNC fitters.
    • Direct Subcontract / Purchasing Cost: Supplier POs (e.g., specialized glass shutters or custom metalwork).
    • Gross Profit Margin (%): Net margin achieved on the fitting project.
  2. Accounts Receivable Aging Summary:
    • Accounting β†’ Accounts Receivable Summary (View Report)
    • Confirms zero outstanding balances across closed projects.

6. Complete System Flow Summary ​

β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚              EDGE HOME SOLUTIONS COMPLETE OPERATIONAL LIFECYCLE                 β”‚
β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€
β”‚ Phase             β”‚ Key ERP Documents Created        β”‚ Physical Milestone       β”‚
β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€
β”‚ 1. CRM & Intake   β”‚ Lead, Survey Notes, 3D Render    β”‚ Site Laser Measurement   β”‚
β”‚ 2. Quoting & SO   β”‚ Quotation (50-40-10), Sales Orderβ”‚ Approved 3D & Contract   β”‚
β”‚ 3. Initial Depositβ”‚ Sales Invoice (50%), Payment Rec.β”‚ 50% Bank Deposit Inflow  β”‚
β”‚ 4. PM & Workshop  β”‚ Project (12 Tasks), Stock Entriesβ”‚ CNC, Assembly & Mounting β”‚
β”‚ 5. Progress Billingβ”‚ Sales Invoice (40%), Payment Rec.β”‚ Site Delivery & Staging  β”‚
β”‚ 6. Final Handover β”‚ Sales Invoice (10%), Payment Rec.β”‚ Snag Sign-off & P&L Closeβ”‚