5. Progress & Final Invoicing, Receipting & Project Closeout β
This guide covers the completion stages at Edge Home Solutions: issuing the 40% Delivery Milestone Invoice & Receipt, managing site finishing and snag clearance, issuing the 10% Final Retention Invoice & Receipt, and performing real-time project profitability and gross margin analysis.
1. Natural System Flow Position β
mermaid
flowchart LR
A["1. Lead Intake & 3D Survey"] --> B["2. Quotation & Contract"]
B --> C["3. 50% Deposit Invoicing & Receipt"]
C --> D["4. Project Execution & Workshop"]
D --> E["π 5. Progress/Final Invoicing & Closeout"]
style E fill:#2563eb,stroke:#1d4ed8,color:#ffffffπ₯οΈ Live ERP Desk Screens for Step 5
- π§Ύ Create Sales Invoice Screen β Issue 40% delivery or 10% retention invoice.
- π΅ Create Payment Entry Screen β Record progress or final client payment receipt.
- π All Sales Invoices List β Check payment status across all project invoices.
- π Project Profitability Report β Analyze actual revenue, material cost, labor, and gross profit margin.
- π Accounts Receivable Summary β Verify zero outstanding client debt upon project closeout.
- π Profit and Loss Statement β View company-wide monthly and quarterly financial performance.
2. Milestone 2: 40% Delivery Invoicing & Payment Entry β
When workshop pre-assembly is completed and modular cabinetry is staged at the client site:
Generating the 40% Delivery Sales Invoice: β
- Open the Sales Order (or go to Sales Invoice List).
- Click Create β Sales Invoice.
- Under Payment Schedule, select Milestone 2: EHS 40% Workshop Completion / Delivery (calculates to 40% of contract sum).
- Verify VAT / eTIMS compliance.
- Click Save and Submit.
Recording the 40% Payment Entry: β
- From the Sales Invoice, click Create β Payment.
- Verify:
- Payment Type:
Receive. - Account Paid To: Selected Bank / M-Pesa account.
- Paid Amount (KES): 40% progress amount.
- Cheque / Reference No: Bank transaction reference.
- Payment Type:
- Click Save and Submit.
3. Site Installation, Snagging & Handover Acceptance (Task 9 - 12) β
With the progress payment confirmed, site fitters complete final installation:
Key Finishing Milestones: β
- Task 9: Shutter doors hung, 3-way concealed hinges adjusted for uniform 2mm reveal gaps, soft-close dampers calibrated.
- Task 10: Calacatta quartz or granite countertop template verified, undermount sink epoxy bonded, hob cutout chamfered, and waterproof silicone sealed.
- Task 11: LED ambient warm lighting wired, surface protective foils peeled, cabinet interiors vacuumed, and panels polished.
Joint Snag Walkthrough & Sign-off (Task 12): β
- Lead Project Engineer and Client perform joint inspection.
- Complete Snag Clearance Checklist:
- [ ] Smooth soft-close drawer damping without bounce.
- [ ] Shutter door alignments perfectly plumb and flush.
- [ ] Countertop joints sealed and polished seamlessly.
- [ ] Kickplates and filler trims scribed neatly to floor and wall.
- Client signs the Handover Acceptance Certificate.
- Mark Task 12 and Project status as
Completed.
4. Milestone 3: 10% Final Retention Invoicing & Final Receipt β
Upon client handover sign-off:
1. Issue Final 10% Retention Invoice: β
- Open the Sales Order β Create β Sales Invoice.
- Select Milestone 3: EHS 10% Final Retention Handover.
- Verify remaining 10% balance.
- Click Save and Submit.
2. Record Final Payment Entry: β
- Click Create β Payment.
- Enter Bank / M-Pesa reference and submit.
- Result: Sales Order, all 3 Milestone Invoices, and all 3 Payment Entries show status
Paid / Closed.
5. Post-Project Costing & Profitability Analysis β
ERPNext automatically aggregates all project revenue against actual costs to provide real-time gross profit metrics:
Financial Analysis Tools: β
- Project Profitability Report:
- Navigate to Projects β Reports β Project Profitability (View Report).
- Total Billed Revenue: Sum of Milestone Invoices (50% + 40% + 10%).
- Direct Material Cost: Stock Entries issued to
Workshop WIP(MDF, Plywood, Quartz, Hardware). - Direct Labor Cost: Timesheet hours logged by workshop carpenters and CNC fitters.
- Direct Subcontract / Purchasing Cost: Supplier POs (e.g., specialized glass shutters or custom metalwork).
- Gross Profit Margin (%): Net margin achieved on the fitting project.
- Accounts Receivable Aging Summary:
Accounting β Accounts Receivable Summary(View Report)- Confirms zero outstanding balances across closed projects.
6. Complete System Flow Summary β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β EDGE HOME SOLUTIONS COMPLETE OPERATIONAL LIFECYCLE β
βββββββββββββββββββββ¬βββββββββββββββββββββββββββββββββββ¬βββββββββββββββββββββββββββ€
β Phase β Key ERP Documents Created β Physical Milestone β
βββββββββββββββββββββΌβββββββββββββββββββββββββββββββββββΌβββββββββββββββββββββββββββ€
β 1. CRM & Intake β Lead, Survey Notes, 3D Render β Site Laser Measurement β
β 2. Quoting & SO β Quotation (50-40-10), Sales Orderβ Approved 3D & Contract β
β 3. Initial Depositβ Sales Invoice (50%), Payment Rec.β 50% Bank Deposit Inflow β
β 4. PM & Workshop β Project (12 Tasks), Stock Entriesβ CNC, Assembly & Mounting β
β 5. Progress Billingβ Sales Invoice (40%), Payment Rec.β Site Delivery & Staging β
β 6. Final Handover β Sales Invoice (10%), Payment Rec.β Snag Sign-off & P&L Closeβ