4. Project Management & Joinery Execution โ€‹

This guide covers the core operational phase at Edge Home Solutions: launching the 12-task project pipeline, managing raw materials across the 4-tier warehouse structure, CNC sizing, edge-banding, workshop carcass pre-assembly, and on-site carcass installation.


1. Natural System Flow Position โ€‹

mermaid
flowchart LR
    A["1. Lead Intake & 3D Survey"] --> B["2. Quotation & Contract"]
    B --> C["3. 50% Deposit Invoicing & Receipt"]
    C --> D["๐Ÿ“Œ 4. Project Execution & Workshop"]
    D --> E["5. Progress/Final Invoicing & Closeout"]
    style D fill:#2563eb,stroke:#1d4ed8,color:#ffffff

๐Ÿ–ฅ๏ธ Live ERP Desk Screens for Step 4


2. Launching the Project & 12-Task Pipeline โ€‹

Once the 50% advance deposit is confirmed, the Project Manager initializes the standardized joinery execution template:

Step-by-Step Project Creation: โ€‹

  1. Navigate to Projects โ†’ Project โ†’ + Add Project (or access Project List).
  2. Fill in project details:
    • Project Name: Format as [Client Name] - [Site Location] - [Fitting Type] (e.g., Dr. Samuel Karanja - Kilimani Penthouse - Modular Kitchen & Master Wardrobe).
    • Customer: Select client name.
    • Sales Order: Link the confirmed Sales Order.
    • Project Template: Select Custom Interior Fitting (Wardrobe / Kitchen / Cabinetry).
    • Estimated Start / End Date: Contract schedule.
  3. Click Save.

The 12-Task Standard Pipeline: โ€‹

[Phase 1: Design Verification & Sourcing]
  โ”œโ”€โ”€ Task 1: Site Laser Survey & Technical Verification
  โ”œโ”€โ”€ Task 2: 3D CAD Production Drawings & Cut-List Optimization
  โ””โ”€โ”€ Task 3: Material Requisition & Hardware Sourcing
[Phase 2: Workshop Joinery Fabrication]
  โ”œโ”€โ”€ Task 4: Panel Precision Sizing & CNC Milling
  โ”œโ”€โ”€ Task 5: 1mm/2mm PVC Edge-Banding & Trimming
  โ””โ”€โ”€ Task 6: Workshop Carcass Pre-Assembly & Quality Check
[Phase 3: Dispatch & Site Staging]
  โ”œโ”€โ”€ Task 7: Protective Wrapping & Site Staging Transfer
  โ””โ”€โ”€ Task 8: Carcass Mounting, Leveling & Wall Anchoring
[Phase 4: Countertop, Shutter & Hardware Fitment]
  โ”œโ”€โ”€ Task 9: Shutter Doors, Soft-Close Hinges & Drawer Alignment
  โ”œโ”€โ”€ Task 10: Countertop Templating, Cutting & Appliance Fitment
  โ”œโ”€โ”€ Task 11: Final Polish, Soft-Close Calibration & Clean-up
  โ””โ”€โ”€ Task 12: Joint Snag Inspection & Client Sign-off Handover

3. Inventory Control Across the 4-Tier Warehouses โ€‹

Edge Home Solutions traces materials through 4 purpose-built warehouse locations:

[Main Store - EHS]
  โ””โ”€โ”€ Bulk MDF, marine ply, edge tape rolls, soft-close hardware & quartz slabs.
         โ†“ (Stock Entry: Material Transfer tagged to Project)
[Workshop WIP - EHS]
  โ””โ”€โ”€ Panels on CNC bed, edge-bander, and assembly benches.
         โ†“ (Stock Entry: Material Transfer upon pre-assembly)
[Finished Goods - EHS]
  โ””โ”€โ”€ Pre-assembled modular carcasses & packaged shutters ready for dispatch.
         โ†“ (Stock Entry: Material Transfer upon delivery)
[Site Staging - EHS]
  โ””โ”€โ”€ Secure staging inside client apartment during on-site installation.

Issuing Materials to Workshop (Stock Entry): โ€‹

  1. Navigate to Stock โ†’ Stock Entry โ†’ + Add Stock Entry (Stock Entry List).
  2. Stock Entry Purpose: Material Transfer.
  3. Source Warehouse: Main Store - EHS.
  4. Target Warehouse: Workshop WIP - EHS.
  5. Project: Select the active project.
  6. Item Table: Add required materials from the production cut-list:
    • 18mm High Density MDF (EHS-MDF-18MM)
    • 18mm Marine Waterproof Plywood (EHS-PLY-18MM-MAR)
    • Soft-close Concealed Hinges (EHS-HNG-SC-01)
    • 500mm Tandem Runner Boxes (EHS-SLD-TBX-500)
    • 22mm PVC Edge Banding (EHS-EB-PVC-22MM)
  7. Click Save and Submit.

4. Workshop Joinery & Site Installation Execution โ€‹

1. Panel Sizing & CNC Machining (Task 4 & 5) โ€‹

  • Cut-lists are imported into the panel saw / CNC optimizer to maximize board yield and minimize scrap.
  • Panels are routed, hinge cup holes bored at 35mm standard, and drawer slide pilot holes drilled.
  • Heavy-duty 1mm/2mm PVC edge banding is applied with PUR waterproof hot-melt glue.

2. Workshop Pre-Assembly (Task 6) โ€‹

  • Carcasses are square-assembled, back panels grooved and screwed, and drawer boxes test-fitted.
  • Workshop Lead conducts pre-delivery QA: verifying dimensions against architectural drawings.

3. Site Staging & Carcass Mounting (Task 7 & 8) โ€‹

  • Modular units are shrink-wrapped and transported to the client's residence.
  • Stock Transfer is recorded from Workshop WIP - EHS โ†’ Site Staging - EHS.
  • Site fitters laser-level base cabinets, mount heavy-duty wall hanging brackets, and secure overhead wall units.

IMPORTANT

Delivery Milestone Trigger: Once workshop pre-assembly is finished and carcasses are staged on site, the project triggers Milestone 2 (40% Progress Delivery Invoice) before final stone cutting and door hanging!


5. Next Step in System Flow โ€‹

โžก๏ธ Proceed to 5. Progress & Final Invoicing, Receipting & Project Closeout