4. Project Management & Joinery Execution โ
This guide covers the core operational phase at Edge Home Solutions: launching the 12-task project pipeline, managing raw materials across the 4-tier warehouse structure, CNC sizing, edge-banding, workshop carcass pre-assembly, and on-site carcass installation.
1. Natural System Flow Position โ
mermaid
flowchart LR
A["1. Lead Intake & 3D Survey"] --> B["2. Quotation & Contract"]
B --> C["3. 50% Deposit Invoicing & Receipt"]
C --> D["๐ 4. Project Execution & Workshop"]
D --> E["5. Progress/Final Invoicing & Closeout"]
style D fill:#2563eb,stroke:#1d4ed8,color:#ffffff๐ฅ๏ธ Live ERP Desk Screens for Step 4
- โ Create New Project Screen โ Launch a new fitting project with 12-task template.
- ๐ All Projects List โ Monitor project status, Gantt schedules, and completion %.
- โ All Tasks & Kanban Screen โ Assign CNC, edge-banding, and fitting tasks to carpenters.
- ๐ Create Stock Entry (Material Transfer) โ Issue raw boards & hardware to Workshop WIP.
- ๐ฆ All Stock Entries List โ View all warehouse transfer logs.
- ๐ Stock Balance Report โ Check real-time stock across Main Store, WIP, and Site Staging.
- ๐ Purchase Orders Screen โ Procure quartz slabs, specialty fittings, and materials from suppliers.
2. Launching the Project & 12-Task Pipeline โ
Once the 50% advance deposit is confirmed, the Project Manager initializes the standardized joinery execution template:
Step-by-Step Project Creation: โ
- Navigate to Projects โ Project โ + Add Project (or access Project List).
- Fill in project details:
- Project Name: Format as
[Client Name] - [Site Location] - [Fitting Type](e.g., Dr. Samuel Karanja - Kilimani Penthouse - Modular Kitchen & Master Wardrobe). - Customer: Select client name.
- Sales Order: Link the confirmed Sales Order.
- Project Template: Select
Custom Interior Fitting (Wardrobe / Kitchen / Cabinetry). - Estimated Start / End Date: Contract schedule.
- Project Name: Format as
- Click Save.
The 12-Task Standard Pipeline: โ
[Phase 1: Design Verification & Sourcing]
โโโ Task 1: Site Laser Survey & Technical Verification
โโโ Task 2: 3D CAD Production Drawings & Cut-List Optimization
โโโ Task 3: Material Requisition & Hardware Sourcing
[Phase 2: Workshop Joinery Fabrication]
โโโ Task 4: Panel Precision Sizing & CNC Milling
โโโ Task 5: 1mm/2mm PVC Edge-Banding & Trimming
โโโ Task 6: Workshop Carcass Pre-Assembly & Quality Check
[Phase 3: Dispatch & Site Staging]
โโโ Task 7: Protective Wrapping & Site Staging Transfer
โโโ Task 8: Carcass Mounting, Leveling & Wall Anchoring
[Phase 4: Countertop, Shutter & Hardware Fitment]
โโโ Task 9: Shutter Doors, Soft-Close Hinges & Drawer Alignment
โโโ Task 10: Countertop Templating, Cutting & Appliance Fitment
โโโ Task 11: Final Polish, Soft-Close Calibration & Clean-up
โโโ Task 12: Joint Snag Inspection & Client Sign-off Handover3. Inventory Control Across the 4-Tier Warehouses โ
Edge Home Solutions traces materials through 4 purpose-built warehouse locations:
[Main Store - EHS]
โโโ Bulk MDF, marine ply, edge tape rolls, soft-close hardware & quartz slabs.
โ (Stock Entry: Material Transfer tagged to Project)
[Workshop WIP - EHS]
โโโ Panels on CNC bed, edge-bander, and assembly benches.
โ (Stock Entry: Material Transfer upon pre-assembly)
[Finished Goods - EHS]
โโโ Pre-assembled modular carcasses & packaged shutters ready for dispatch.
โ (Stock Entry: Material Transfer upon delivery)
[Site Staging - EHS]
โโโ Secure staging inside client apartment during on-site installation.Issuing Materials to Workshop (Stock Entry): โ
- Navigate to Stock โ Stock Entry โ + Add Stock Entry (Stock Entry List).
- Stock Entry Purpose:
Material Transfer. - Source Warehouse:
Main Store - EHS. - Target Warehouse:
Workshop WIP - EHS. - Project: Select the active project.
- Item Table: Add required materials from the production cut-list:
- 18mm High Density MDF (
EHS-MDF-18MM) - 18mm Marine Waterproof Plywood (
EHS-PLY-18MM-MAR) - Soft-close Concealed Hinges (
EHS-HNG-SC-01) - 500mm Tandem Runner Boxes (
EHS-SLD-TBX-500) - 22mm PVC Edge Banding (
EHS-EB-PVC-22MM)
- 18mm High Density MDF (
- Click Save and Submit.
4. Workshop Joinery & Site Installation Execution โ
1. Panel Sizing & CNC Machining (Task 4 & 5) โ
- Cut-lists are imported into the panel saw / CNC optimizer to maximize board yield and minimize scrap.
- Panels are routed, hinge cup holes bored at 35mm standard, and drawer slide pilot holes drilled.
- Heavy-duty 1mm/2mm PVC edge banding is applied with PUR waterproof hot-melt glue.
2. Workshop Pre-Assembly (Task 6) โ
- Carcasses are square-assembled, back panels grooved and screwed, and drawer boxes test-fitted.
- Workshop Lead conducts pre-delivery QA: verifying dimensions against architectural drawings.
3. Site Staging & Carcass Mounting (Task 7 & 8) โ
- Modular units are shrink-wrapped and transported to the client's residence.
- Stock Transfer is recorded from
Workshop WIP - EHSโSite Staging - EHS. - Site fitters laser-level base cabinets, mount heavy-duty wall hanging brackets, and secure overhead wall units.
IMPORTANT
Delivery Milestone Trigger: Once workshop pre-assembly is finished and carcasses are staged on site, the project triggers Milestone 2 (40% Progress Delivery Invoice) before final stone cutting and door hanging!
5. Next Step in System Flow โ
โก๏ธ Proceed to 5. Progress & Final Invoicing, Receipting & Project Closeout