This guide explains how Edge Home Solutions translates approved 3D designs into itemized quotations, applies the 50-40-10 milestone payment structure, and secures client contracts to generate active Sales Orders.
1. Natural System Flow Position โ
mermaid
flowchart LR
A["1. Lead Intake & 3D Survey"] --> B["๐ 2. Quotation & Contract"]
B --> C["3. 50% Deposit Invoicing & Receipt"]
C --> D["4. Project Execution & Workshop"]
D --> E["5. Progress/Final Invoicing & Closeout"]
style B fill:#2563eb,stroke:#1d4ed8,color:#ffffff๐ฅ๏ธ Live ERP Desk Screens for Step 2
- โ Create New Quotation Screen โ Draft a new customer proposal.
- ๐ All Quotations List โ View sent, approved, and pending quotes.
- ๐ฆ All Sales Orders List โ View confirmed client contracts ready for billing & project execution.
- ๐ท๏ธ Item Master Directory โ Browse joinery items, standard linear rates, and hardware codes.
- ๐ Payment Terms Templates โ View/configure the 50-40-10 milestone schedule.
2. Drafting an Interior Fitting Quotation โ
Step-by-Step Creation: โ
- Open the qualified Lead and click Create โ Quotation (or navigate to Selling โ Quotation โ + Add Quotation at + Add New Quotation / Quotation List).
- Quotation To: Select
LeadorCustomer. - Company:
Edge Home Solutions. - Valid Till Date: Set quotation validity (typically 30 days).
- Payment Terms Template: Choose
Interior Fitting Standard (50-40-10).
3. Standard Joinery Item Master Table โ
Add custom joinery units, hardware packages, and professional installation line items:
| Item Code | Item Description | Unit of Measure | Standard Scope / Specifications |
|---|---|---|---|
EHS-KTC-MOD-001 | Bespoke Modular Fitted Kitchen | Linear Meter | High-gloss acrylic/melamine shutters, 18mm marine plywood carcass, soft-close hinges |
EHS-QRTZ-CAL-20 | 20mm Calacatta Quartz Worktop | Linear Meter | Polished solid quartz slab, undermount sink cut-out & polished 40mm mitered edge |
EHS-WRD-FIT-001 | Custom Built-in Wardrobe | Linear Meter | Floor-to-ceiling wardrobe with hanging lift, internal drawers & LED aluminum channel |
EHS-VNT-FLT-001 | Floating Bathroom Vanity Unit | Set | Moisture-proof marine ply vanity with twin soft-close drawers & stone counter |
EHS-TV-PNL-001 | Luxury TV Feature Wall Unit | Set | Fluted panel backdrop, floating media console, and ambient warm LED profile lighting |
EHS-SRV-INST-FIT | Master Carpenter Site Installation | Nos | On-site assembly, laser leveling, wall mounting, scribe fitting & clean snagging |
4. The 50-40-10 Milestone Payment Terms โ
Edge Home Solutions standard commercial contracts divide payments into 3 milestone tranches:
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ EHS Standard Milestone Payment Terms (50-40-10) โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโฌโโโโโโโโโโโโโฌโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโค
โ Milestone Description โ Percentage โ Trigger Condition โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโผโโโโโโโโโโโโโผโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโค
โ 1. Initial Deposit โ 50% โ Contract Signing & 3D Sign-off โ
โ 2. Progress / Delivery โ 40% โ Workshop Pre-assembly & Delivery โ
โ 3. Final Retention โ 10% โ Joint Snag Sign-off & Handover โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโดโโโโโโโโโโโโโดโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ- 50% Advance Deposit (
EHS 50% Advance Deposit):- Trigger: Contract signing and 3D architectural design sign-off.
- Operational Purpose: Unlocks raw material procurement (MDF/plywood boards, quartz slabs, hardware) and initiates workshop CNC panel sizing.
- 40% Progress Delivery (
EHS 40% Workshop Completion / Delivery):- Trigger: Workshop carcass pre-assembly completion and dispatch staging to client site.
- Operational Purpose: Covers fabrication labor, transport, and initiates on-site carcass mounting.
- 10% Final Retention (
EHS 10% Final Retention Handover):- Trigger: Joint snagging walk-through, door alignment, and signed Handover Acceptance Form.
- Operational Purpose: Final customer satisfaction sign-off and warranty initiation.
5. Converting Quotation to Sales Order โ
Once the client accepts the proposal:
- Open the submitted Quotation.
- Click Create โ Sales Order.
- Verify items, quantities, delivery date, and payment terms.
- Click Save and Submit.
IMPORTANT
Immediate Action Required: Do NOT begin procurement or workshop fabrication until the client has paid the 50% Advance Deposit. The next mandatory step is generating the Milestone 1 Sales Invoice and recording the Bank/M-Pesa payment receipt!
6. Next Step in System Flow โ
โก๏ธ Proceed to 3. Initial Invoicing & Deposit Receipting (Milestone 1: 50%)