3. Inventory, Raw Materials & Warehouses

This guide explains how Edge Home Solutions tracks stock, manages board materials, fittings, and handles internal material movements through the 4-tier warehouse structure.


1. Warehouse Architecture

Edge Home Solutions uses 4 purpose-driven warehouses to trace materials through fabrication:

[Main Store - EHS] 
   └── Bulk boards, full hardware cartons, edge tape rolls & quartz slabs.
          ↓ (Material Transfer)
[Workshop WIP - EHS] 
   └── Panels being cut, edge-banded, and assembled into carcasses.
          ↓ (Manufacture / Assembly)
[Finished Goods - EHS] 
   └── Wrapped modular units & assembled wardrobe cabinets ready for dispatch.
          ↓ (Site Staging Transfer)
[Site Staging - EHS] 
   └── Secure on-site staging at client apartment during installation.

2. Core Material Master Catalog

CategoryItem CodeItem DescriptionStock UOMValuation (KES)
Boards & PanelsEHS-MDF-18MM18mm High Density MDF (8ft x 4ft)Sheet2,800.00
EHS-PLY-18MM-MAR18mm Marine Waterproof Plywood (8ft x 4ft)Sheet4,200.00
EHS-MEL-18MM-WHT18mm White Matt Melamine Board (8ft x 4ft)Sheet3,100.00
Hardware & FittingsEHS-HNG-SC-01Hydraulic Soft-Close Concealed HingePair250.00
EHS-SLD-TBX-500500mm Soft-Close Tandem Runner BoxSet1,800.00
EHS-HND-PRF-BLMatte Black Aluminum Gola Handle (3m)Linear Meter850.00
EHS-WRD-LFT-HYDHydraulic Wardrobe Pull-Down Clothes RailSet4,500.00
EHS-KTC-MGC-CRNKitchen Magic Corner Pull-out OrganizerSet12,500.00
Finishes & EdgingEHS-EB-PVC-22MM22mm x 1mm PVC Edge Banding Tape (100m)Roll1,200.00
CountertopsEHS-QRTZ-CAL-2020mm Calacatta Quartz Countertop SlabLinear Meter8,500.00

3. Recording Stock Transfers (Issuing Materials to Workshop)

When a project enters production:

  1. Go to Stock → Stock Entry → + Add Stock Entry (https://erp.edgehomesolutions.co.ke/desk/stock-entry).
  2. Set Stock Entry Purpose: Material Transfer.
  3. Set Default Source Warehouse: Main Store - EHS.
  4. Set Default Target Warehouse: Workshop WIP - EHS.
  5. In the Project field, select the client's project.
  6. Add items and quantities (e.g., 14 sheets of EHS-MDF-18MM, 28 pairs of EHS-HNG-SC-01, 2 rolls of EHS-EB-PVC-22MM).
  7. Click Save and Submit.

Financial Impact: The material cost is moved from raw inventory to Work-in-Progress and logged under the project's real-time cost sheet.


4. Reconciling Stock & Managing Offcuts

  • Periodic Stock Reconciliation: Go to Stock → Stock Reconciliation to count physical sheets and boxes in the store.
  • Offcut / Usable Scrap Boards: If large usable panel pieces remain after CNC cutting, create a Stock Entry with purpose Material Receipt back to Main Store - EHS with an offcut tag so they can be used on smaller vanities or shelving.